Improvements

Spring Road Improvements 2024

Entire exterior of house scraped & painted, two coats
Painted entire interior
5 new windows main level
Engineered hardwood main level throughout
Entire main floor leveled
All new subfloor
Board and batten throughout main level
Original beams meticulously restored
Thick brick accent wall main level & kitchen backsplash-whitewashed
All new kitchen:
cabinets, granite counters, new island, sink, faucet, gold hardwear, stove hood
Stainless Steel appliances
Recessed lighting in kitchen
Raised ceiling in kitchen
Raised ceiling in main family room & dining room
New LED lighting throughout
Recessed lighting first floor bedroom
Added closet and made 4th bedroom on 1st floor
New screens on porch
Repaired & painted screen porch
Repaired soffit and added additional gutters and drainage in back
New window in basement
Sheetrock & painted in laundry room, painted floors
Repaired sheetrock and painted all other rooms in basement
Insulated utility room/ storage room (hot water tank) in basement
Extensive concrete leveling of floor in utility room
Brand new rugs with thick padding on 2nd Flr
2nd flr hallway light fixture
Leveled patio bricks and added railroad ties to walk out basement patio
Repaired and replaced wood boards on shed
Scraped & painted shed
Two new toilets basement & main level
Painted stairs & new carpet runner
New fireplace mantel
Added door to basement
Created a laundry folding station with cabinets and counter
New drop sink In laundry room
Landscaping

2022
Added concrete patio
Lanscaping by Kulak”s Nursery


2021
New Electric Water Heater
Mitsubishi ductless heating and cooling systems-2 compressors and 5 units.

2016 New Vinyl Fencing

2013
Retaining wall
Paved circular driveway

2012
New front walkway
Added Perennials-Kulak’s
2 New Anderson Windows

2011
Anderson window

2010
New side walkway-sealed and maintained regularly
Fresh drains installed
New 30 yr rubber roof added over screen porch